Installation at Le Creuset
AMCP’s teams participated in the ramp-up at Le Creuset by supplying and installing the floor conveyors for the enameling of the casseroles.
Installation at Nidec Leroy-Somer
ACMP has installed a lifting section on a double rail conveyor at Nidec Leroy-Somer. The section has three levels and can be used to load gearboxes of different sizes.
2019
ACMP has designed, supplied and installed a conveyor for a research center in Irradiation.
2018
New Quality thinking focused on risks and opportunities with the obtaining of the ISO9001 V2015 certification.
2016
ACMP obtains ISO9001 certification.
2014
ACMP starts several large projects with Westinghouse for the dismantling of the Chooz A nuclear power plant.
2012
Diagnosis and reflection on Prevention and Safety for the establishment of the Single Document. Self-certification CE of the productions.
2006
The years 2000 are a period of development, evolution and constant progress. In an industrial context that had become morose, the company reoriented itself towards a manufacturing process more focused on advanced boiler making and value-added services and materials in order to meet the needs of our customers.
2000
5 employees were hired and the design office was equipped with Autocad 2D and 3D CAD software.
1999
The company’s premises were expanded with the construction of a workshop with an additional surface area of 1200 m2.